IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0171 # 05 Y:1999 05 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $27,540 $1,000 Not Implemented
AR0170 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,421 $6,020 Implemented
AR0170 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $84 $60 Not Implemented
AR0170 # 03 Y:1999 03 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $113,600 $4,700 Not Implemented
AR0170 # 04 Y:1999 04 1999 IMPROVE SPACE COMFORT CONDITIONING $6,120 $1,916 Not Implemented
AR0167 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $5,846 $2,240 Implemented
AR0167 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,264 $5,441 Implemented
AR0167 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,657 $250 Implemented
AR0167 # 04 Y:1999 04 1999 REPAIR AND ELIMINATE STEAM LEAKS $7,742 $205 Implemented
AR0167 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,523 $0 Implemented
AR0167 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,567 $200 Implemented
AR0167 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,681 $8,274 Not Implemented
AR0167 # 08 Y:1999 08 1999 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $2,390,400 $4,500,000 Not Implemented
AR0167 # 09 Y:1999 09 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $3,707 $1,791 Implemented
AR0167 # 10 Y:1999 10 1999 USE OPTIMUM THICKNESS INSULATION $86,793 $85,710 Not Implemented
AR0167 # 11 Y:1999 11 1999 AUTOMATE FINISHING PROCESS $80,703 $51,700 Not Implemented
AR0168 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,016 $608 Implemented
AR0168 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $223 $0 Implemented
AR0168 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $11,649 $7,750 Not Implemented
AR0168 # 04 Y:1999 04 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $21,008 $100 Not Implemented
AR0165 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $440 $767 n/a
AR0165 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $91 $0 n/a
AR0165 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,463 $4,772 n/a
AR0165 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $22,777 $3,207 n/a
AR0165 # 05 Y:1999 05 1999 MOVE PRODUCT USING MECHANICAL MEANS $14,000 $32,400 n/a