IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0283 # 04 Y:2004 04 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,877 $100,430 Not Implemented
WV0283 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,643 $1,290 Implemented
WV0283 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,222 $6,500 Not Implemented
WV0283 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,923 $86 Implemented
WV0283 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,561 $1,416 Implemented
WV0283 # 09 Y:2004 09 2004 USE SYNTHETIC LUBRICANT $2,247 $2,020 Not Implemented
WV0283 # 10 Y:2004 10 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,509 $1,338 Not Implemented
WV0283 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $764 $0 Implemented
WV0283 # 12 Y:2004 12 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $739 $295 Not Implemented
WV0283 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $633 $1,830 Implemented
WV0283 # 14 Y:2004 14 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $493 $860 Implemented
NC0262 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,471 $10,000 Not Implemented
NC0262 # 02 Y:2003 02 2003 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $33,773 $55,000 Not Implemented
NC0262 # 03 Y:2003 03 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,320 $5,653 Not Implemented
NC0262 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,339 $50 Not Implemented
NC0262 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,272 $5,225 Not Implemented
NC0262 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,284 $800 Not Implemented
NC0254 # 01 Y:2003 01 2003 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $639,636 $10,000 n/a
NC0254 # 02 Y:2003 02 2003 INSTALL SENSORS TO DETECT DEFECTS $85,500 $3,000 Implemented
NC0254 # 03 Y:2003 03 2003 MODIFY STARTUP/SHUTDOWN TIMES $1,342,708 $10,000 Implemented
NC0254 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,930 $20,000 Not Implemented
NC0254 # 05 Y:2003 05 2003 COVER OPEN TANKS $14,740 $0 Not Implemented
NC0254 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $546 $1,000 Not Implemented
NC0254 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,899 $500 Implemented
NC0254 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,127 $24,350 Not Implemented