Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,474
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0129 # 06 Y:1994 | 06 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,363 | $328 | Implemented |
MO0129 # 07 Y:1994 | 07 | 1994 | USE SYNTHETIC LUBRICANT | $969 | $80 | Implemented |
MO0129 # 08 Y:1994 | 08 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $967 | $995 | Not Implemented |
MO0129 # 09 Y:1994 | 09 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $366 | $1,078 | Not Implemented |
OR0217 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,943 | $5,465 | Implemented |
OR0217 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,072 | $15,891 | Implemented |
OR0217 # 03 Y:1994 | 03 | 1994 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,880 | $3,200 | Implemented |
OR0217 # 04 Y:1994 | 04 | 1994 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $8,519 | $20,000 | Not Implemented |
OR0217 # 05 Y:1994 | 05 | 1994 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,470 | $0 | Implemented |
SF0039 # 01 Y:1994 | 01 | 1994 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,078 | $4,752 | Not Implemented |
SF0039 # 02 Y:1994 | 02 | 1994 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,590 | $2,750 | Implemented |
SF0039 # 03 Y:1994 | 03 | 1994 | INSULATE BARE EQUIPMENT | $2,733 | $3,713 | Implemented |
SF0039 # 04 Y:1994 | 04 | 1994 | INSTALL OCCUPANCY SENSORS | $2,811 | $2,400 | Implemented |
SF0039 # 05 Y:1994 | 05 | 1994 | ADD AREA LIGHTING SWITCHES | $1,444 | $130 | Implemented |
SF0039 # 06 Y:1994 | 06 | 1994 | OPTIMIZE PLANT POWER FACTOR | $2,458 | $4,153 | Not Implemented |
SF0039 # 07 Y:1994 | 07 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,811 | $2,759 | Implemented |
GT0537 # 01 Y:1994 | 01 | 1994 | USE OPTIMUM THICKNESS INSULATION | $5,290 | $3,420 | Not Implemented |
GT0537 # 02 Y:1994 | 02 | 1994 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $534 | $2,465 | Not Implemented |
GT0537 # 03 Y:1994 | 03 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $780 | $1,800 | Not Implemented |
GT0537 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,910 | $19,620 | Not Implemented |
AR0038 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,079 | $300 | Implemented |
AR0038 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,118 | $200 | Implemented |
AR0038 # 03 Y:1994 | 03 | 1994 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $4,094 | $2,000 | Implemented |
AR0038 # 04 Y:1994 | 04 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,584 | $220 | Implemented |
AR0038 # 05 Y:1994 | 05 | 1994 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $20,991 | $30,000 | Not Implemented |