IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0120 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $165,697 $5,304 Implemented
LL0120 # 02 Y:2001 02 2001 USE PHOTOCELL CONTROLS $8,053 $110 Implemented
LL0120 # 03 Y:2001 03 2001 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $205,089 $425,809 n/a
LL0120 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,925 $7,125 Not Implemented
LL0120 # 05 Y:2001 05 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $11,530 $0 Not Implemented
LE0119 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,354 $1,920 Implemented
LE0119 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,434 $0 Implemented
LE0119 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,497 $1,250 Not Implemented
LE0119 # 04 Y:2001 04 2001 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $19,921 $1,000 Implemented
LE0119 # 05 Y:2001 05 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $17,872 $18,500 Implemented
TA0013 # 01 Y:2001 01 2001 USE SYNTHETIC LUBRICANT $9,690 $0 Not Implemented
TA0013 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,880 $70 Implemented
TA0013 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,300 $2,190 Implemented
TA0013 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $1,590 $130 Implemented
TA0013 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,130 $110 Implemented
TA0013 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $660 $85 Implemented
IC0016 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,997 $4,100 n/a
IC0016 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,313 $6,313 n/a
IC0016 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,123 $2,769 n/a
IC0016 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,259 $1,795 n/a
IC0016 # 05 Y:2001 05 2001 USE OPTIMUM THICKNESS INSULATION $4,304 $3,360 n/a
IC0016 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $668 $328 n/a
IC0016 # 07 Y:2001 07 2001 INSTALL SET-BACK TIMERS $2,723 $2,500 n/a
IC0016 # 08 Y:2001 08 2001 $76,800 $8,000 n/a
UD0634 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $7,175 $1,720 Not Implemented