Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0395 # 01 Y:2001 | 01 | 2001 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $23,700 | $0 | Implemented |
OR0395 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $367,000 | $2,750,000 | Not Implemented |
OR0395 # 03 Y:2001 | 03 | 2001 | USE PHOTOCELL CONTROLS | $19,090 | $5,610 | Implemented |
OR0395 # 04 Y:2001 | 04 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $12,795 | $37,900 | Not Implemented |
OR0395 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,155 | $25,870 | Implemented |
LE0119 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,354 | $1,920 | Implemented |
LE0119 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,434 | $0 | Implemented |
LE0119 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $1,497 | $1,250 | Not Implemented |
LE0119 # 04 Y:2001 | 04 | 2001 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $19,921 | $1,000 | Implemented |
LE0119 # 05 Y:2001 | 05 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $17,872 | $18,500 | Implemented |
TA0013 # 01 Y:2001 | 01 | 2001 | USE SYNTHETIC LUBRICANT | $9,690 | $0 | Not Implemented |
TA0013 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,880 | $70 | Implemented |
TA0013 # 03 Y:2001 | 03 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,300 | $2,190 | Implemented |
TA0013 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $1,590 | $130 | Implemented |
TA0013 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $1,130 | $110 | Implemented |
TA0013 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $660 | $85 | Implemented |
IC0016 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,997 | $4,100 | n/a |
IC0016 # 02 Y:2001 | 02 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,313 | $6,313 | n/a |
IC0016 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $1,123 | $2,769 | n/a |
IC0016 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,259 | $1,795 | n/a |
IC0016 # 05 Y:2001 | 05 | 2001 | USE OPTIMUM THICKNESS INSULATION | $4,304 | $3,360 | n/a |
IC0016 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $668 | $328 | n/a |
IC0016 # 07 Y:2001 | 07 | 2001 | INSTALL SET-BACK TIMERS | $2,723 | $2,500 | n/a |
IC0016 # 08 Y:2001 | 08 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $76,800 | $8,000 | n/a |
UD0634 # 01 Y:2001 | 01 | 2001 | INSULATE BARE EQUIPMENT | $7,175 | $1,720 | Not Implemented |