IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0539 # 02 Y:2019 02 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $6,161 $518 Implemented
UF0539 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,651 $11,760 Not Implemented
UF0539 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,250 $11,853 Implemented
UF0539 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,002 $3,662 Implemented
UF0539 # 06 Y:2019 06 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $44,758 $3,326 Not Implemented
UF0538 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,744 $52,547 Implemented
UF0538 # 02 Y:2019 02 2019 INSTALL SKYLIGHTS $11,989 $45,500 Implemented
UF0538 # 03 Y:2019 03 2019 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,027 $7,692 Implemented
UF0538 # 04 Y:2019 04 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,964 $6,180 Implemented
UF0537 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $55,866 $333,760 Not Implemented
UF0537 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,122 $61,119 Not Implemented
UF0537 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $14,734 $25,470 Not Implemented
UF0537 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $9,846 $1,101 Not Implemented
UF0537 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,091 $8,377 Implemented
UF0537 # 06 Y:2019 06 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,428 $500 Implemented
UF0537 # 07 Y:2019 07 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,046 $914 Implemented
UF0537 # 08 Y:2019 08 2019 UPGRADE CONTROLS ON COMPRESSORS $4,046 $6,800 Not Implemented
UF0537 # 09 Y:2019 09 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $37,600 $100,000 Implemented
UF0537 # 10 Y:2019 10 2019 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $40,781 $21,000 Not Implemented
UF0536 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,130 $557 Not Implemented
UF0536 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,331 $25,000 Not Implemented
UF0536 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,433 $2,264 Not Implemented
UF0536 # 04 Y:2019 04 2019 CLEAN CONDENSER TUBES $4,554 $4,248 Not Implemented
UF0536 # 05 Y:2019 05 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $25,860 $33,265 Not Implemented
UF0536 # 06 Y:2019 06 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,000 $18,548 Not Implemented