IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0476 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $435 $100 Implemented
NC0476 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,322 $2,500 Not Implemented
NC0476 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $9,719 $3,000 Implemented
NC0476 # 05 Y:2013 05 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,556 $7,000 Not Implemented
NC0476 # 06 Y:2013 06 2013 ELIMINATE SHIFT $688,031 $25,000 Implemented
NC0475 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,801 $48,075 Not Implemented
NC0475 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $9,597 $5,600 Not Implemented
NC0475 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $1,124 Not Implemented
NC0475 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $100 Not Implemented
NC0475 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,988 $4,750 Not Implemented
NC0475 # 06 Y:2013 06 2013 REDUCE FLUID FLOW RATES $16,217 $25,000 Not Implemented
NC0474 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $93,874 $176,250 Implemented
NC0474 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,365 $52,188 Implemented
NC0474 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,078 $1,180 Implemented
NC0474 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $3,817 $7,000 Not Implemented
NC0474 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,019 $3,470 Implemented
NC0474 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,431 $1,000 Implemented
NC0474 # 07 Y:2013 07 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,656 $25,000 Not Implemented
NC0474 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $13,419 $5,700 Implemented
NC0474 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,672 $100 Implemented
NC0473 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,630 $62,137 Implemented
NC0473 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,071 $40,919 Implemented
NC0473 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $582 $562 Implemented
NC0473 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $6,691 $3,000 Implemented
NC0473 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,417 $200 Implemented