IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0517 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $35,400 $7,000 Implemented
OR0517 # 03 Y:2007 03 2007 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $18,000 $0 Implemented
OR0517 # 04 Y:2007 04 2007 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $17,200 $500 Implemented
OR0517 # 05 Y:2007 05 2007 INCREASE USE OF AUTOMATION $10,400 $10,000 Not Implemented
OR0517 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $6,100 $3,750 Implemented
OR0517 # 07 Y:2007 07 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $3,460 $10,350 Implemented
OR0517 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $0 Implemented
OR0517 # 09 Y:2007 09 2007 OPTIMIZE PLANT POWER FACTOR $1,470 $0 Not Implemented
OR0516 # 01 Y:2007 01 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,800 $0 Not Implemented
OR0516 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,100 $37,100 Implemented
OR0516 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,600 $15,300 Implemented
OR0516 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $5,300 $7,800 Implemented
OR0516 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,400 $9,800 Implemented
OR0516 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $2,800 $13,200 Not Implemented
OR0516 # 07 Y:2007 07 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,300 $26,900 Not Implemented
OR0515 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,800 $0 Implemented
OR0515 # 02 Y:2007 02 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,200 $0 Implemented
OR0515 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $14,600 $45,000 Implemented
OR0515 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $1,900 $5,000 Not Implemented
OR0514 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,300 $0 Implemented
OR0514 # 02 Y:2007 02 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $135,120 $4,350 Not Implemented
OR0514 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,900 $500 Not Implemented
OR0514 # 04 Y:2007 04 2007 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,400 $1,000 Not Implemented
OR0514 # 05 Y:2007 05 2007 DEVELOP STANDARD OPERATING PROCEDURES $204,000 $18,800 Not Implemented
OR0514 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $7,700 Implemented