IAC logo
IAC Assessment: OR0521
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0521
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2007
Principal Product plywood
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $50,000,000-$100,000,000
# of Employees 305
Plant Area (Sq.Ft.) 700,000
Annual Production 250,000 Thousand Feet
Production Hrs. Annual 7,300
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $918,488 25,923,000 kWh $0.04
Electricity Demand $212,010 55,500 kW-months/year $3.82
Electricity Fees $39,915 - $ -
TOTAL ENERGY COSTS $1,185,525
RECOMMENDED SAVINGS* $220,870 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $220,870
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood
$ kWh $ kW-months/year $ MMBtu
01: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$92,300
Cost:
$44,300
- - - - $92,300 69,900 -
-
kWh
-
-
kW-months/year
$92,300
69,900
MMBtu
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$37,000
Cost:
$20,600
$37,000 157,200 - - - - $37,000
157,200
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$27,300
Cost:
-
$27,300 658,400 - - - - $27,300
658,400
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$27,800
Cost:
$12,500
$27,800 78,840 - - - - $27,800
78,840
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,600
Cost:
$9,600
$9,600 225,200 - - - - $9,600
225,200
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,300
Cost:
-
$7,300 170,500 - - - - $7,300
170,500
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,100
Cost:
$45,000
$6,185 176,700 $915 20 - - $6,185
176,700
kWh
$915
20
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,250
Cost:
$9,300
$4,800 136,900 $450 10 - - $4,800
136,900
kWh
$450
10
kW-months/year
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,720
Cost:
$5,100
$3,600 102,044 $120 3 - - $3,600
102,044
kWh
$120
3
kW-months/year
-
-
MMBtu
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,600
Cost:
$4,500
$1,600 45,900 - - - - $1,600
45,900
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,900
Cost:
$1,800
$1,900 38,000 - - - - $1,900
38,000
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$220,870
Cost:
$152,700
$127,085 1,789,684 $1,485 33 $92,300 69,900 $127,085
1,789,684
kWh
$1,485
33
kW-months/year
$92,300
69,900
MMBtu
TOTAL IMPLEMENTED Savings:
$220,870
Cost:
$152,700
$127,085 1,789,684 $1,485 33 $92,300 69,900 $127,085
1,789,684
kWh
$1,485
33
kW-months/year
$92,300
69,900
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood