IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0096 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,092 $1,530 Implemented
OR0096 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,603 $13,000 Implemented
OK0310 # 03 Y:1990 03 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,917 $776 Implemented
OK0310 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $510 $850 Implemented
OK0310 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $96 $280 Implemented
OK0311 # 01 Y:1990 01 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,239 $2,150 Implemented
OK0311 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,549 $750 Implemented
OK0311 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,942 $1,641 Not Implemented
OK0311 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $578 $190 Implemented
OK0311 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,396 $0 Implemented
OK0311 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,283 $632 Not Implemented
OK0311 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,494 $975 Implemented
OK0312 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,262 $450 Implemented
OK0312 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $148 Implemented
OK0312 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $486 $1,175 Not Implemented
OK0312 # 04 Y:1990 04 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $61 $51 Not Implemented
OK0312 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $69 $0 Implemented
OK0313 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,286 $7,300 Implemented
OK0313 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,725 $0 Implemented
OK0313 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $890 $614 Implemented
OK0313 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,985 $16,500 Not Implemented
OK0313 # 05 Y:1990 05 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,867 $1,650 Implemented
OK0313 # 06 Y:1990 06 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,238 $5,800 Implemented
OK0314 # 01 Y:1990 01 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,575 $18,500 Implemented
OK0314 # 02 Y:1990 02 1990 COVER OPEN TANKS $7,010 $2,397 Not Implemented