IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0169 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $812 $0 Not Implemented
BD0169 # 05 Y:2000 05 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $690 $0 Implemented
BD0169 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $543 $450 Not Implemented
BD0169 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $150 Implemented
BD0169 # 08 Y:2000 08 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $10,916 $3,700 Implemented
BD0169 # 09 Y:2000 09 2000 MINIMIZE WATER USAGE $400 $750 Not Implemented
BD0169 # 10 Y:2000 10 2000 AUTOMATE PAYROLL SYSTEM $163 $50 Implemented
BD0169 # 11 Y:2000 11 2000 PAY BILLS ON TIME TO AVOID LATE FEES $97 $0 Implemented
AR0191 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $1,877 Implemented
AR0191 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,105 $1,590 Not Implemented
AR0191 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $582 $0 Not Implemented
AR0191 # 04 Y:2000 04 2000 USE MAGNETIC TECHNOLOGY TO TREAT WATER $12,000 $10,374 Implemented
AR0191 # 05 Y:2000 05 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $74,880 $80,000 Not Implemented
AR0191 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $95,071 $13,210 Implemented
HO0236 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $3,159 $2,800 n/a
HO0236 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $15 n/a
HO0236 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $400 n/a
HO0236 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,167 $120 n/a
HO0236 # 05 Y:2000 05 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,374 $20,000 n/a
HO0236 # 06 Y:2000 06 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $985 $250 n/a
HO0236 # 07 Y:2000 07 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $7,650 $5,000 n/a
HO0236 # 08 Y:2000 08 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,912 $5,880 n/a
HO0236 # 09 Y:2000 09 2000 IMPROVE SPACE COMFORT CONDITIONING $1,160 $335 n/a
HO0236 # 10 Y:2000 10 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $419,000 $30,000 n/a
HO0236 # 11 Y:2000 11 2000 METER WASTE WATER $1,000 $250 n/a