IAC logo
IAC Assessment: BD0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Machined Parts
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 48,000
Annual Production 500,000 Units
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,113 1,493,259 kWh $0.06
Electricity Demand $2,724 821 kW-months/year $3.32
Electricity Fees $40 - $ -
Natural Gas $3,694 706 MMBtu $5.23
TOTAL ENERGY COSTS $100,405
RECOMMENDED SAVINGS* $31,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,423
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost Primary Product Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost Primary Product
$ kWh $ MMBtu $ Tgal $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,339
Cost:
$13,140
$9,339 152,989 - - - - - - - - $9,339
152,989
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,421
Cost:
$700
$6,421 105,217 - - - - - - - - $6,421
105,217
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,564
Cost:
$2,000
- - $1,564 328 - - - - - - -
-
kWh
$1,564
328
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$812
Cost:
-
$812 13,189 - - - - - - - - $812
13,189
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$690
Cost:
-
$690 12,896 - - - - - - - - $690
12,896
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$543
Cost:
$450
$543 8,792 - - - - - - - - $543
8,792
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$136
Cost:
$150
$81 1,465 - - - - $55 - - - $81
1,465
kWh
-
-
MMBtu
-
-
Tgal
$55
-
$
-
-
$
08: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$10,916
Cost:
$3,700
- - - - $10,916 14,976 - - - - -
-
kWh
-
-
MMBtu
$10,916
14,976
Tgal
-
-
$
-
-
$
09: 3.4151 MINIMIZE WATER USAGE Savings:
$400
Cost:
$750
- - - - $400 109,200 - - - - -
-
kWh
-
-
MMBtu
$400
109,200
Tgal
-
-
$
-
-
$
10: 4.447 AUTOMATE PAYROLL SYSTEM Savings:
$163
Cost:
$50
- - - - - - - - $163 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
$163
-
$
11: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$97
Cost:
-
- - - - - - - - $97 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
$97
-
$
TOTAL RECOMMENDED Savings:
$31,081
Cost:
$20,940
$17,886 294,548 $1,564 328 $11,316 124,176 $55 - $260 - $17,886
294,548
kWh
$1,564
328
MMBtu
$11,316
124,176
Tgal
$55
-
$
$260
-
$
TOTAL IMPLEMENTED Savings:
$18,423
Cost:
$4,600
$7,192 119,578 - - $10,916 14,976 $55 - $260 - $7,192
119,578
kWh
-
-
MMBtu
$10,916
14,976
Tgal
$55
-
$
$260
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ $
Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost Primary Product Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost Primary Product