Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0105 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,424 | $7,315 | Implemented |
IP0104 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,554 | $0 | Implemented |
IP0104 # 02 Y:2018 | 02 | 2018 | COMBINE UTILITY METERS | $2,606 | $0 | Not Implemented |
IP0104 # 03 Y:2018 | 03 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,002 | $0 | Not Implemented |
IP0104 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $22,395 | $5,924 | Implemented |
IP0104 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,594 | $475 | Implemented |
IP0104 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,678 | $2,725 | Implemented |
IP0104 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,529 | $4,887 | Implemented |
MI0337 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,349 | $76,979 | Implemented |
MI0337 # 02 Y:2018 | 02 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $41,184 | $480 | Implemented |
MI0337 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,197 | $11,846 | Not Implemented |
MI0337 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $26,104 | $3,000 | Implemented |
MI0337 # 05 Y:2018 | 05 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $24,458 | $31,600 | Not Implemented |
MI0337 # 06 Y:2018 | 06 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,780 | $78,320 | Not Implemented |
MI0337 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,813 | $2,030 | Implemented |
MI0337 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $14,515 | $19,215 | Implemented |
MI0337 # 09 Y:2018 | 09 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,557 | $2,528 | Not Implemented |
MI0337 # 10 Y:2018 | 10 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,724 | $7,314 | Implemented |
MI0337 # 11 Y:2018 | 11 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,571 | $6,578 | Implemented |
WM0124 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,040 | $13,392 | Not Implemented |
WM0124 # 02 Y:2018 | 02 | 2018 | PAY UTILITY BILLS ON TIME | $2,620 | $0 | Not Implemented |
WM0124 # 03 Y:2018 | 03 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,534 | $0 | Implemented |
WM0124 # 04 Y:2018 | 04 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,472 | $690 | Not Implemented |
WM0124 # 05 Y:2018 | 05 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,404 | $405 | Not Implemented |
WM0124 # 06 Y:2018 | 06 | 2018 | USE SYNTHETIC LUBRICANT | $1,387 | $1,710 | Implemented |