IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0120 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,595 $54,918 Implemented
UF0120 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $730 $4,270 Implemented
UF0120 # 03 Y:1995 03 1995 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $2,103 $3,500 Not Implemented
UF0120 # 04 Y:1995 04 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,769 $520 Not Implemented
UF0120 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,217 $850 Implemented
UF0120 # 06 Y:1995 06 1995 INSTALL COMMON HEADER ON COMPRESSORS $3,282 $2,500 Not Implemented
UF0120 # 07 Y:1995 07 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,241 $5,000 Not Implemented
UF0119 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,375 $3,338 Implemented
UF0119 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,924 $84,732 Implemented
UF0119 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,579 $1,457 Implemented
UF0119 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,827 $350 Implemented
UF0119 # 05 Y:1995 05 1995 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $20,739 $18,879 Not Implemented
UF0119 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $3,078 $2,752 Not Implemented
UF0118 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $31,040 $7,890 Not Implemented
UF0118 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,741 $23,485 Implemented
UF0118 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,754 $10,491 Not Implemented
UF0118 # 04 Y:1995 04 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,198 $4,450 Implemented
UF0118 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,793 $10,316 Not Implemented
UF0118 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $604 $975 Not Implemented
UF0118 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,350 $5,610 Implemented
UF0118 # 08 Y:1995 08 1995 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $8,112 $0 Implemented
UF0118 # 09 Y:1995 09 1995 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $17,631 $7,000 Not Implemented
UF0115 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,197 $919 Implemented
UF0115 # 02 Y:1995 02 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,494 $4,500 Not Implemented
UF0115 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,819 $1,500 Not Implemented