Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,615
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0299 # 11 Y:2000 | 11 | 2000 | CONDENSE OPERATION INTO ONE BUILDING | $7,500 | $6,043 | Not Implemented |
ME0299 # 10 Y:2000 | 10 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $197 | $240 | Not Implemented |
ME0299 # 09 Y:2000 | 09 | 2000 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $87,478 | $8,500 | Not Implemented |
ME0299 # 08 Y:2000 | 08 | 2000 | INSULATE FEEDWATER TANK | $412 | $80 | Not Implemented |
ME0299 # 07 Y:2000 | 07 | 2000 | PAY UTILITY BILLS ON TIME | $484 | $0 | Not Implemented |
ME0299 # 06 Y:2000 | 06 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $820 | $1,637 | Not Implemented |
ME0299 # 05 Y:2000 | 05 | 2000 | COMBINE UTILITY METERS | $1,333 | $3,910 | Not Implemented |
ME0299 # 04 Y:2000 | 04 | 2000 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,337 | $2,440 | Not Implemented |
ME0299 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,620 | $13,380 | Not Implemented |
ME0299 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,184 | $14,916 | Not Implemented |
ME0299 # 01 Y:2000 | 01 | 2000 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $8,563 | $9,360 | Not Implemented |
ME0298 # 07 Y:2000 | 07 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $20,769 | $0 | Not Implemented |
ME0298 # 06 Y:2000 | 06 | 2000 | REDUCE SCRAP PRODUCTION | $61,470 | $204,600 | Not Implemented |
ME0298 # 05 Y:2000 | 05 | 2000 | INSULATE FEEDWATER TANK | $88 | $250 | Not Implemented |
ME0298 # 04 Y:2000 | 04 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $241 | $450 | Not Implemented |
ME0298 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,392 | $340 | Implemented |
ME0298 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,062 | $5,845 | Not Implemented |
ME0298 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,240 | $66,900 | Implemented |
ME0297 # 08 Y:2000 | 08 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,500 | $2,000 | n/a |
ME0297 # 07 Y:2000 | 07 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $27,000 | $14,835 | n/a |
ME0297 # 06 Y:2000 | 06 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $54,200 | $28,115 | n/a |
ME0297 # 05 Y:2000 | 05 | 2000 | MAKE A NEW BY-PRODUCT | $267,435 | $280,836 | n/a |
ME0297 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $964 | $300 | n/a |
ME0297 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,934 | $8,265 | n/a |
ME0297 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,161 | $8,745 | n/a |