IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,615

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0299 # 11 Y:2000 11 2000 CONDENSE OPERATION INTO ONE BUILDING $7,500 $6,043 Not Implemented
ME0299 # 10 Y:2000 10 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $197 $240 Not Implemented
ME0299 # 09 Y:2000 09 2000 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $87,478 $8,500 Not Implemented
ME0299 # 08 Y:2000 08 2000 INSULATE FEEDWATER TANK $412 $80 Not Implemented
ME0299 # 07 Y:2000 07 2000 PAY UTILITY BILLS ON TIME $484 $0 Not Implemented
ME0299 # 06 Y:2000 06 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $820 $1,637 Not Implemented
ME0299 # 05 Y:2000 05 2000 COMBINE UTILITY METERS $1,333 $3,910 Not Implemented
ME0299 # 04 Y:2000 04 2000 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,337 $2,440 Not Implemented
ME0299 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $4,620 $13,380 Not Implemented
ME0299 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,184 $14,916 Not Implemented
ME0299 # 01 Y:2000 01 2000 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $8,563 $9,360 Not Implemented
ME0298 # 07 Y:2000 07 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $20,769 $0 Not Implemented
ME0298 # 06 Y:2000 06 2000 REDUCE SCRAP PRODUCTION $61,470 $204,600 Not Implemented
ME0298 # 05 Y:2000 05 2000 INSULATE FEEDWATER TANK $88 $250 Not Implemented
ME0298 # 04 Y:2000 04 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $241 $450 Not Implemented
ME0298 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,392 $340 Implemented
ME0298 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,062 $5,845 Not Implemented
ME0298 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,240 $66,900 Implemented
ME0297 # 08 Y:2000 08 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,500 $2,000 n/a
ME0297 # 07 Y:2000 07 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $27,000 $14,835 n/a
ME0297 # 06 Y:2000 06 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $54,200 $28,115 n/a
ME0297 # 05 Y:2000 05 2000 MAKE A NEW BY-PRODUCT $267,435 $280,836 n/a
ME0297 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $964 $300 n/a
ME0297 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,934 $8,265 n/a
ME0297 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,161 $8,745 n/a