Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,027
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1096 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,966 | $0 | n/a |
UD1095 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,050 | $0 | n/a |
UD1095 # 02 Y:2024 | 02 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $581 | $10,500 | n/a |
UD1095 # 01 Y:2024 | 01 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $252 | $1,500 | n/a |
UD1094 # 03 Y:2024 | 03 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $342 | $20,000 | n/a |
UD1094 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $880 | $0 | n/a |
UD1094 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $9,350 | $130,000 | n/a |
UD1093 # 09 Y:2024 | 09 | 2024 | OPTIMIZE PLANT POWER FACTOR | $13,480 | $31,200 | n/a |
UD1093 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,573 | $48,200 | n/a |
UD1093 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,360 | $48,200 | n/a |
UD1093 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,442 | $953 | n/a |
UD1093 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,522 | $2,450 | n/a |
UD1093 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,446 | $9,639 | n/a |
UD1093 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,247 | $720 | n/a |
UD1093 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,271 | $772 | n/a |
UD1093 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,379 | $1,330 | n/a |
UD1092 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $23,052 | $34,302 | n/a |
UD1092 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $60,291 | $0 | n/a |
UD1092 # 03 Y:2024 | 03 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,477 | $5,670 | n/a |
UD1092 # 02 Y:2024 | 02 | 2024 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,755 | $0 | n/a |
UD1092 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $26,516 | $0 | n/a |
WV0669 # 17 Y:2024 | 17 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $135 | $363 | n/a |
WV0669 # 16 Y:2024 | 16 | 2024 | INSULATE BARE EQUIPMENT | $357 | $798 | n/a |
WV0669 # 15 Y:2024 | 15 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $397 | $1,920 | n/a |
WV0669 # 14 Y:2024 | 14 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $843 | $1,200 | n/a |