Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
299
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0549 # 15 Y:2017 | 15 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $527 | $2,000 | Implemented |
WV0549 # 16 Y:2017 | 16 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $308 | $20 | Implemented |
WV0549 # 17 Y:2017 | 17 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $286 | $1,075 | Implemented |
WV0549 # 01 Y:2017 | 01 | 2017 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,748 | $105,000 | Not Implemented |
WV0549 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,549 | $0 | Implemented |
WV0549 # 03 Y:2017 | 03 | 2017 | USE PHOTOCELL CONTROLS | $4,781 | $0 | Implemented |
WV0549 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,263 | $11,180 | Implemented |
WV0549 # 05 Y:2017 | 05 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,241 | $1,000 | Implemented |
UD0969 # 11 Y:2017 | 11 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,502 | $844 | Implemented |
UD0969 # 14 Y:2017 | 14 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,321 | $811 | Implemented |
UD0969 # 13 Y:2017 | 13 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,423 | $32,880 | Not Implemented |
UD0969 # 12 Y:2017 | 12 | 2017 | INSTALL TURBULATORS | $795 | $1,250 | Not Implemented |
UD0969 # 10 Y:2017 | 10 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,536 | $6,000 | Not Implemented |
UD0969 # 09 Y:2017 | 09 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,251 | $30 | Implemented |
UD0969 # 08 Y:2017 | 08 | 2017 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $6,275 | $5,250 | Not Implemented |
UD0969 # 07 Y:2017 | 07 | 2017 | REDUCE EXCESS STEAM BLEEDING | $6,926 | $1,050 | Not Implemented |
UD0969 # 06 Y:2017 | 06 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $22,591 | $63,800 | Implemented |
UD0969 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,419 | $1,000 | Implemented |
UD0969 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,470 | $2,500 | Not Implemented |
UD0969 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,188 | $30 | Implemented |
UD0969 # 02 Y:2017 | 02 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,357 | $30 | Implemented |
UD0969 # 01 Y:2017 | 01 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,613 | $30 | Implemented |
UD0968 # 06 Y:2017 | 06 | 2017 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $87,734 | $2,000 | Not Implemented |
UD0968 # 04 Y:2017 | 04 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,217 | $118 | Implemented |
UD0968 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,870 | $0 | Implemented |