Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
625
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0388 # 03 Y:2021 | 03 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $32,022 | $38,081 | Implemented |
MI0388 # 02 Y:2021 | 02 | 2021 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $86,796 | $86,796 | Not Implemented |
MI0388 # 01 Y:2021 | 01 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $132,105 | $960 | Not Implemented |
MI0385 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $754 | $1,614 | Not Implemented |
MI0385 # 07 Y:2020 | 07 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,275 | $234 | Implemented |
MI0385 # 06 Y:2020 | 06 | 2020 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $1,866 | $4,760 | Implemented |
MI0385 # 05 Y:2020 | 05 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,338 | $100 | Not Implemented |
MI0385 # 04 Y:2020 | 04 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,719 | $3,215 | Not Implemented |
MI0385 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,898 | $2,100 | Implemented |
MI0385 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,047 | $1,660 | Implemented |
MI0385 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,589 | $6,672 | Implemented |
MI0379 # 02 Y:2020 | 02 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,551 | $2,080 | Not Implemented |
MI0379 # 01 Y:2020 | 01 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $192,230 | $217,000 | Implemented |
MI0379 # 03 Y:2020 | 03 | 2020 | USE SOLAR HEAT TO HEAT WATER | $9,075 | $12,000 | Not Implemented |
MI0379 # 05 Y:2020 | 05 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,953 | $5,914 | Not Implemented |
MI0379 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,317 | $2,100 | Not Implemented |
MI0379 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,846 | $1,980 | Not Implemented |
MI0371 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $210 | $407 | Implemented |
MI0371 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $473 | $325 | Implemented |
MI0371 # 05 Y:2020 | 05 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,638 | $2,460 | Implemented |
MI0371 # 04 Y:2020 | 04 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,708 | $1,275 | Implemented |
MI0371 # 03 Y:2020 | 03 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,458 | $5,640 | Implemented |
MI0371 # 02 Y:2020 | 02 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,462 | $820 | Implemented |
MI0371 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,343 | $7,557 | Implemented |
MI0368 # 09 Y:2020 | 09 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $626 | $1,661 | Implemented |