IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,746

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0010 # 04 Y:1984 04 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $930 $0 Implemented
ST0010 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,071 $429 Implemented
ST0010 # 02 Y:1984 02 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,173 $0 Implemented
ST0010 # 01 Y:1984 01 1984 BURN WASTE PAPER FOR HEAT $17,516 $25,000 Not Implemented
ST0009 # 10 Y:1984 10 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $370 $750 Not Implemented
ST0009 # 09 Y:1984 09 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $679 $130 Not Implemented
ST0009 # 08 Y:1984 08 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,149 $0 Implemented
ST0009 # 07 Y:1984 07 1984 INSTALL AUTOMATIC STACK DAMPER $251 $60 Not Implemented
ST0009 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32 $28 Not Implemented
ST0009 # 04 Y:1984 04 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $136 $0 Implemented
ST0009 # 03 Y:1984 03 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $50 $0 Implemented
ST0009 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $201 $537 Implemented
ST0009 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,275 $212 Not Implemented
TS0004 # 04 Y:1984 04 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,174 $42,000 Not Implemented
TS0004 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $396 $33 Not Implemented
TS0004 # 02 Y:1984 02 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,748 $0 Not Implemented
TS0004 # 01 Y:1984 01 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,158 $1,360 Not Implemented
TN0237 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $402 $0 Not Implemented
TN0237 # 03 Y:1984 03 1984 RECOVER WASTE HEAT FROM EQUIPMENT $56 $50 Not Implemented
TN0238 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,856 $0 Not Implemented
TN0238 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $1,292 $794 Implemented
TN0238 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $956 $140 Implemented
TN0238 # 04 Y:1984 04 1984 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,287 $0 Implemented
TN0238 # 11 Y:1984 11 1984 INSULATE BARE EQUIPMENT $47 $35 Not Implemented
TN0238 # 10 Y:1984 10 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $207 $32 Implemented