IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0402 # 05 Y:1997 05 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $970 $0 Not Implemented
CO0402 # 04 Y:1997 04 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $930 $0 Not Implemented
CO0402 # 03 Y:1997 03 1997 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $1,180 $1,000 Not Implemented
CO0402 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,200 $2,920 Not Implemented
CO0402 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $635 $995 Not Implemented
KU0485 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $128,310 $186,000 Not Implemented
KU0485 # 07 Y:1997 07 1997 METER WASTE WATER $230 $100 Implemented
KU0485 # 06 Y:1997 06 1997 RECOVER AND REUSE COOLING WATER $1,080 $1,180 Implemented
KU0485 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,170 $5,260 Not Implemented
KU0485 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $230 $40 Not Implemented
KU0485 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $470 $300 Implemented
KU0485 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $660 Implemented
KU0485 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,310 $190 Implemented
KG0100 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,484 $0 n/a
KG0100 # 03 Y:1997 03 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,554 $0 n/a
KG0100 # 02 Y:1997 02 1997 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,859 $1,744 n/a
KG0100 # 01 Y:1997 01 1997 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,133 $248 n/a
UF0190 # 11 Y:1997 11 1997 INSTALL SENSORS TO DETECT DEFECTS $7,272 $2,400 Not Implemented
UF0190 # 10 Y:1997 10 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,407 $0 Implemented
UF0190 # 09 Y:1997 09 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,235 $11,000 Not Implemented
UF0190 # 08 Y:1997 08 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $291 $405 Not Implemented
UF0190 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,664 $1,100 Implemented
UF0190 # 06 Y:1997 06 1997 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $27,537 $59,500 Not Implemented
UF0190 # 05 Y:1997 05 1997 USE OPTIMUM THICKNESS INSULATION $7,093 $3,500 Not Implemented
UF0190 # 04 Y:1997 04 1997 INSTALL OCCUPANCY SENSORS $10,982 $1,856 Not Implemented