IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0029 # 05 Y:2008 05 2008 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6 $20 Implemented
MZ0029 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,075 $43,400 Implemented
MZ0029 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,216 $900 Not Implemented
MZ0029 # 02 Y:2008 02 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,047 $0 Not Implemented
MZ0029 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,405 $900 Not Implemented
OK0771 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $12,463 $846 Not Implemented
OK0771 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,125 $3,460 Not Implemented
OK0771 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,458 $0 Not Implemented
OK0771 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,066 $0 Not Implemented
OK0771 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $2,875 Not Implemented
OK0771 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $284 $1,213 Not Implemented
OK0771 # 07 Y:2008 07 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,068 $200 Not Implemented
DL0030 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $120 $140 Implemented
DL0030 # 05 Y:2008 05 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,675 $0 Implemented
DL0030 # 04 Y:2008 04 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,890 $7,500 Not Implemented
DL0030 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,623 $5,306 Implemented
DL0030 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,055 $25,852 Implemented
DL0030 # 01 Y:2008 01 2008 REPLACE BOILER $5,600 $0 Not Implemented
GT0858 # 01 Y:2008 01 2008 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,046 $0 Implemented
GT0858 # 02 Y:2008 02 2008 Equipment Scheduling $5,630 $0 Not Implemented
GT0858 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $16,189 $33,180 Implemented
GT0858 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,485 $4,500 Implemented
GT0858 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,063 $10,879 Implemented
GT0858 # 06 Y:2008 06 2008 USE SOLAR HEAT TO HEAT WATER $3,687 $7,500 Not Implemented
GT0858 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $475 $900 Not Implemented