Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,553
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0238 # 04 Y:1992 | 04 | 1992 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $10,215 | $31,246 | Not Implemented |
MA0238 # 05 Y:1992 | 05 | 1992 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $8,950 | $27,957 | Not Implemented |
MA0238 # 06 Y:1992 | 06 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,814 | $2,053 | Implemented |
MA0238 # 07 Y:1992 | 07 | 1992 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,305 | $0 | Implemented |
MA0238 # 08 Y:1992 | 08 | 1992 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $181 | $100 | Implemented |
MA0238 # 09 Y:1992 | 09 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48 | $0 | Not Implemented |
MA0228 # 01 Y:1991 | 01 | 1991 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $27,069 | $0 | Not Implemented |
MA0228 # 02 Y:1991 | 02 | 1991 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $8,647 | $5,000 | Implemented |
MA0228 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,534 | $2,000 | Implemented |
MA0228 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,585 | $15,000 | Not Implemented |
MA0228 # 05 Y:1991 | 05 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $891 | $400 | Implemented |
MA0228 # 06 Y:1991 | 06 | 1991 | INSULATE BARE EQUIPMENT | $458 | $430 | Implemented |
MA0203 # 01 Y:1991 | 01 | 1991 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $13,019 | $8,029 | Implemented |
MA0203 # 02 Y:1991 | 02 | 1991 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,245 | $2,182 | Implemented |
MA0203 # 03 Y:1991 | 03 | 1991 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $778 | $547 | Implemented |
MA0203 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,651 | $32,018 | Implemented |
MA0203 # 05 Y:1991 | 05 | 1991 | INSTALL SET-BACK TIMERS | $642 | $161 | Implemented |
MA0201 # 01 Y:1991 | 01 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 03 Y:1991 | 03 | 1991 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $159,131 | $425,925 | Not Implemented |
MA0201 # 04 Y:1991 | 04 | 1991 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,784 | $500 | Not Implemented |
MA0195 # 01 Y:1990 | 01 | 1990 | INSULATE BARE EQUIPMENT | $3,539 | $1,600 | Not Implemented |
MA0195 # 02 Y:1990 | 02 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,203 | $1,196 | Implemented |
MA0195 # 03 Y:1990 | 03 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,675 | $0 | Implemented |
MA0195 # 04 Y:1990 | 04 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $245 | $95 | Not Implemented |