Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1409 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PLANT POWER FACTOR | $13,858 | $7,731 | Not Implemented |
UK1409 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,135 | $456 | Not Implemented |
UK1409 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,815 | $2,358 | Not Implemented |
UK1409 # 05 Y:2014 | 05 | 2014 | COMBINE UTILITY METERS | $2,250 | $831 | Not Implemented |
UK1409 # 06 Y:2014 | 06 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,197 | $0 | Not Implemented |
UK1409 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,648 | $16,700 | Not Implemented |
UK1409 # 08 Y:2014 | 08 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $33,225 | $3,000 | Not Implemented |
UK1409 # 09 Y:2014 | 09 | 2014 | INSULATE BARE EQUIPMENT | $10,898 | $18,400 | Not Implemented |
UK1409 # 10 Y:2014 | 10 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,187 | $2,400 | Not Implemented |
UK1409 # 11 Y:2014 | 11 | 2014 | ELIMINATE/REDUCE AN OPERATION | $27,643 | $9,000 | Not Implemented |
MZ0158 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,805 | $8,100 | Not Implemented |
MZ0158 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,949 | $2,100 | Not Implemented |
MZ0158 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,912 | $5,470 | Not Implemented |
MZ0158 # 04 Y:2014 | 04 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,802 | $13,500 | Not Implemented |
MZ0158 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,484 | $1,525 | Not Implemented |
UK1408 # 01 Y:2014 | 01 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $15,613 | $3,894 | Not Implemented |
UK1408 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,448 | $2,000 | Implemented |
UK1408 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $7,600 | $17,000 | Not Implemented |
UK1408 # 04 Y:2014 | 04 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $40,960 | $204,000 | Not Implemented |
UK1408 # 05 Y:2014 | 05 | 2014 | OPTIMIZE PLANT POWER FACTOR | $36,000 | $32,528 | Implemented |
UK1408 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $217,346 | $140,476 | Not Implemented |
UK1408 # 07 Y:2014 | 07 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580,500 | $386,500 | Not Implemented |
UK1407 # 01 Y:2014 | 01 | 2014 | INSTALL OCCUPANCY SENSORS | $5,608 | $2,257 | Not Implemented |
UK1407 # 02 Y:2014 | 02 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,566 | $0 | Not Implemented |
UK1407 # 03 Y:2014 | 03 | 2014 | DISCONNECT BALLASTS | $1,000 | $237 | Not Implemented |