Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0476 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,573 | $6,995 | Implemented |
SF0438 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,414 | $840 | Implemented |
SF0438 # 02 Y:2013 | 02 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,345 | $2,494 | Implemented |
SF0438 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,090 | $4,441 | Implemented |
SF0438 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $176 | $105 | Implemented |
SF0438 # 05 Y:2013 | 05 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $3,906 | $4,995 | Implemented |
SF0438 # 06 Y:2013 | 06 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,153 | $5,267 | Implemented |
SF0438 # 07 Y:2013 | 07 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,126 | $11,332 | Not Implemented |
SF0438 # 08 Y:2013 | 08 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,281 | $7,509 | Not Implemented |
SF0438 # 09 Y:2013 | 09 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $799 | $2,008 | Not Implemented |
SF0438 # 10 Y:2013 | 10 | 2013 | INSTALL OCCUPANCY SENSORS | $2,748 | $8,715 | Not Implemented |
SF0438 # 11 Y:2013 | 11 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,005 | $10,308 | Not Implemented |
NC0494 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,160 | $7,564 | Not Implemented |
NC0494 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $1,833 | $1,524 | Not Implemented |
NC0494 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $195 | $61 | Not Implemented |
NC0494 # 04 Y:2013 | 04 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,051 | $825 | Not Implemented |
NC0494 # 05 Y:2013 | 05 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $950 | $4,258 | Not Implemented |
NC0494 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $856 | $820 | Not Implemented |
NC0494 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $410 | $100 | Not Implemented |
UD0888 # 01 Y:2013 | 01 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $396 | $5,000 | Implemented |
UD0888 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $841 | $0 | Implemented |
UD0888 # 03 Y:2013 | 03 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $23,080 | $10,000 | Not Implemented |
UD0888 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,510 | $5,000 | Implemented |
UD0888 # 05 Y:2013 | 05 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,528 | $0 | Not Implemented |
UD0888 # 06 Y:2013 | 06 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $74,025 | $55,000 | Not Implemented |