IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0737 # 05 Y:2021 05 2021 ELIMINATE/REDUCE AN OPERATION $12,333 $94,800 Implemented
CO0737 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $276 $723 Not Implemented
MZ0312 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $19,186 $216,865 Not Implemented
MZ0312 # 02 Y:2021 02 2021 USE EXISTING DAM TO GENERATE ELECTRICITY $20,946 $306,240 Not Implemented
MZ0312 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $2,207 $8,156 Not Implemented
MZ0312 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $480 Implemented
MZ0312 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $1,350 Implemented
WV0609 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,485 $318,088 Not Implemented
WV0609 # 02 Y:2021 02 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,040 $40,560 Not Implemented
WV0609 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $9,397 $42,210 Not Implemented
WV0609 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $5,784 $14,420 Implemented
WV0609 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,695 $3,480 Implemented
WV0609 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,657 $140 Implemented
WV0609 # 07 Y:2021 07 2021 DEVELOP A REPAIR/REPLACE POLICY $3,040 $809 Implemented
WV0609 # 08 Y:2021 08 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,444 $7,620 Not Implemented
WV0609 # 09 Y:2021 09 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,405 $1,500 Implemented
WV0609 # 10 Y:2021 10 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,211 $3,175 Implemented
WV0609 # 11 Y:2021 11 2021 INSULATE BARE EQUIPMENT $1,192 $1,293 Implemented
WV0609 # 12 Y:2021 12 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $487 $1,350 Implemented
UK2103 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,422 $0 n/a
UK2103 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $54 $63 n/a
UK2103 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,386 $4,128 n/a
UK2103 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $328 $0 n/a
MZ0313 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,725 $240 Implemented
MZ0313 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,967 $33,446 Implemented