IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0079 # 14 Y:2017 14 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,861 $3,300 Not Implemented
IP0079 # 15 Y:2017 15 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,112 $79,976 Not Implemented
IP0078 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $820 $4 Implemented
IP0078 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,032 $21 Implemented
IP0078 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $752 Not Implemented
IP0078 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,354 $3,396 Implemented
IP0077 # 01 Y:2017 01 2017 REDUCE VENTILATION AIR $808 $30 Not Implemented
IP0077 # 02 Y:2017 02 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $475 $150 Not Implemented
IP0077 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50 $37 Implemented
IP0077 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $252 $190 Not Implemented
IP0077 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,269 $3,424 Implemented
IP0077 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $1,389 $1,583 Not Implemented
IP0077 # 07 Y:2017 07 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,360 $2,970 Implemented
IP0077 # 08 Y:2017 08 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,841 $51,853 Not Implemented
IP0076 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $13,525 $18 Implemented
IP0076 # 02 Y:2016 02 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $417 $0 Implemented
IP0076 # 03 Y:2016 03 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $292 $45 Implemented
IP0076 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,346 $2,021 Implemented
IP0076 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,878 $12,760 Implemented
IP0075 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,060 $475 Not Implemented
IP0075 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $49,318 $15,186 Not Implemented
IP0075 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $144,133 $37,215 Not Implemented
IP0075 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,278 $17,193 Implemented
IP0075 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,854 $77,418 Implemented
IP0075 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,646 $9,375 Not Implemented