IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0506 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,040 $28,400 n/a
KU0506 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,380 $1,720 n/a
KU0506 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,070 $1,610 n/a
KU0506 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $770 $870 n/a
KU0506 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $750 $800 n/a
KU0506 # 08 Y:1998 08 1998 USE LESS WASTEFUL PACKAGING $23,110 $53,920 n/a
KU0506 # 09 Y:1998 09 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $410 $0 n/a
KU0506 # 10 Y:1998 10 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $146,640 $136,500 n/a
KU0506 # 11 Y:1998 11 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $33,600 $500 n/a
IA0209 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,970 $3,670 Implemented
IA0209 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,774 $871 Implemented
IA0209 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $530 $399 Not Implemented
IA0209 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $50 Not Implemented
IA0209 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $68,734 $2,250 Not Implemented
IA0209 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,857 $7,990 Implemented
IA0209 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $115,785 $151,000 Not Implemented
IA0209 # 08 Y:1998 08 1998 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $50,000 $47,669 Not Implemented
KU0505 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $9,600 Implemented
KU0505 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,350 $20 Implemented
KU0505 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $400 Implemented
KU0505 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $720 $340 Implemented
KU0505 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $510 $260 Implemented
KU0505 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $800 $0 Implemented
KU0505 # 07 Y:1998 07 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $190,000 $333,750 Not Implemented
KU0505 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $75,000 $193,000 Implemented