Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0155 # 03 Y:2007 | 03 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,061 | $2,665 | Not Implemented |
MI0155 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,549 | $23,640 | Not Implemented |
MI0155 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,901 | $27,300 | Not Implemented |
MI0155 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,760 | $1,074 | Not Implemented |
MI0155 # 07 Y:2007 | 07 | 2007 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $7,524 | $7,800 | Not Implemented |
MI0155 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,179 | $30 | Not Implemented |
MI0155 # 09 Y:2007 | 09 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,909 | $180 | Not Implemented |
MI0155 # 10 Y:2007 | 10 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,610 | $3,010 | Not Implemented |
UM0322 # 01 Y:2007 | 01 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $43,338 | $0 | Implemented |
UM0322 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $14,251 | $5,900 | Implemented |
UM0322 # 03 Y:2007 | 03 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,446 | $890 | Not Implemented |
UM0322 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $6,308 | $6,013 | Implemented |
UM0322 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,439 | $1,000 | Implemented |
UM0322 # 06 Y:2007 | 06 | 2007 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,752 | $3,415 | Not Implemented |
UM0322 # 07 Y:2007 | 07 | 2007 | REDUCE FLUID FLOW RATES | $1,434 | $2,200 | Not Implemented |
UM0322 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $913 | $600 | Implemented |
UM0322 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $560 | $1,815 | Not Implemented |
UM0322 # 10 Y:2007 | 10 | 2007 | USE PHOTOCELL CONTROLS | $549 | $190 | Implemented |
BD0330 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,133 | $5,400 | Implemented |
BD0330 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,225 | $8,850 | Implemented |
BD0330 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $1,189 | $2,100 | Implemented |
BD0330 # 04 Y:2007 | 04 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,578 | $0 | Not Implemented |
BD0330 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $160 | $126 | Implemented |
BD0330 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,117 | $0 | Not Implemented |
BD0330 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,489 | $501 | Implemented |