Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0785 # 02 Y:2008 | 02 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $66,859 | $121,500 | Implemented |
UD0785 # 03 Y:2008 | 03 | 2008 | REPLACE BOILER | $54,105 | $88,560 | Not Implemented |
UD0785 # 04 Y:2008 | 04 | 2008 | COVER OPEN TANKS | $13,767 | $55,000 | Not Implemented |
UD0785 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,828 | $98,908 | Implemented |
UD0785 # 06 Y:2008 | 06 | 2008 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,484 | $640 | Not Implemented |
UD0785 # 07 Y:2008 | 07 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,742 | $5,924 | Implemented |
UD0785 # 08 Y:2008 | 08 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,606 | $0 | Not Implemented |
UD0785 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PLANT POWER FACTOR | $3,317 | $4,500 | Not Implemented |
UD0785 # 10 Y:2008 | 10 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,512 | $1,000 | Implemented |
UD0785 # 11 Y:2008 | 11 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,180 | $0 | Not Implemented |
DL0019 # 01 Y:2008 | 01 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $214,300 | $95,000 | Implemented |
DL0019 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $70,880 | $12,500 | Not Implemented |
DL0019 # 03 Y:2008 | 03 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $22,266 | $7,720 | Implemented |
DL0019 # 04 Y:2008 | 04 | 2008 | INSTALL OCCUPANCY SENSORS | $15,891 | $281 | Not Implemented |
DL0019 # 05 Y:2008 | 05 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,324 | $465 | Not Implemented |
DL0019 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,221 | $2,413 | Not Implemented |
DL0019 # 07 Y:2008 | 07 | 2008 | USE COMPRESSOR AIR FILTERS | $3,268 | $500 | Not Implemented |
DL0019 # 08 Y:2008 | 08 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,548 | $0 | Not Implemented |
DL0019 # 09 Y:2008 | 09 | 2008 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $1,248 | $760 | Not Implemented |
NC0380 # 01 Y:2008 | 01 | 2008 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $8,150 | $8,000 | Not Implemented |
NC0380 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,853 | $4,500 | Not Implemented |
NC0380 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $864 | $100 | Implemented |
NC0380 # 04 Y:2008 | 04 | 2008 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $168,000 | $120,000 | Not Implemented |
NC0380 # 05 Y:2008 | 05 | 2008 | IMPROVE SPACE COMFORT CONDITIONING | $89,762 | $37,500 | Not Implemented |
NC0380 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,126 | $91,580 | Not Implemented |