IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0953 # 04 Y:2016 04 2016 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,540 $25,000 Not Implemented
UD0953 # 05 Y:2016 05 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,677 $32,500 Not Implemented
UD0953 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $3,158 $9,400 Not Implemented
UD0953 # 07 Y:2016 07 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $634 $0 Implemented
UD0953 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $964 $5,300 Not Implemented
UD0953 # 09 Y:2016 09 2016 IMPROVE HANDLING PRACTICES $35,646 $100,000 Not Implemented
TT0177 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,244 $15,800 Not Implemented
TT0177 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $6,467 $250 Not Implemented
TT0177 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $4,803 $500 Not Implemented
TT0177 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $2,669 $1,720 Not Implemented
TT0177 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $1,603 $5,250 Not Implemented
TT0177 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,002 $1,400 Implemented
TT0177 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $663 $150 Implemented
TT0177 # 08 Y:2016 08 2016 USE COMPRESSOR AIR FILTERS $338 $75 Implemented
TT0177 # 09 Y:2016 09 2016 INSTALL TIMERS AND/OR THERMOSTATS $108 $23 Not Implemented
SD0536 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $91,093 $350,298 Not Implemented
SD0536 # 02 Y:2016 02 2016 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $23,163 $68,259 Not Implemented
CO0728 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,840 $6,000 n/a
CO0728 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,350 $1,240 n/a
CO0728 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,300 $34,570 n/a
OK0946 # 01 Y:2016 01 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $11,741 $14,041 Not Implemented
OK0946 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $4,580 $10,160 Not Implemented
OK0946 # 03 Y:2016 03 2016 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $5,786 $2,872 Not Implemented
OK0946 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,991 $5,865 Not Implemented
OK0946 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,039 $29,768 Not Implemented