IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0278 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $53,880 $7,750 Not Implemented
MZ0278 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $45,917 $2,907 Implemented
MZ0278 # 07 Y:2019 07 2019 UPGRADE CONTROLS ON COMPRESSORS $42,284 $13,051 Implemented
MZ0278 # 08 Y:2019 08 2019 RECOVER WASTE HEAT FROM EQUIPMENT $35,571 $11,900 Not Implemented
MZ0278 # 09 Y:2019 09 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,558 $870 Implemented
MZ0278 # 10 Y:2019 10 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,709 $200 Implemented
NL0038 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,358 $20,000 Not Implemented
NL0038 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,352 $25,229 Not Implemented
NL0038 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,806 $4,500 Not Implemented
NL0038 # 04 Y:2019 04 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,391 $31,162 Not Implemented
SD0587 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,684 $52,500 Implemented
SD0587 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,956 $5,187 Not Implemented
SD0587 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,075 $0 Implemented
SD0587 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $631 $522 Not Implemented
LS1910 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $1,781 $100 Not Implemented
LS1910 # 02 Y:2019 02 2019 PAY UTILITY BILLS ON TIME $373 $0 Implemented
LS1910 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $229 $25 Not Implemented
LS1910 # 04 Y:2019 04 2019 USE PHOTOCELL CONTROLS $1,096 $250 Not Implemented
LS1910 # 05 Y:2019 05 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,710 $495 Not Implemented
LS1910 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $44 $41 Not Implemented
LS1910 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $531 $10,000 Implemented
GT0929 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,816 $32,516 Implemented
GT0929 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $720 $2,415 Not Implemented
GT0929 # 03 Y:2019 03 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $53,344 $740,232 Not Implemented
GT0929 # 04 Y:2019 04 2019 USE SOLAR HEAT TO HEAT WATER $60,997 $1,000,000 Not Implemented