IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0063 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,174 $300 Implemented
CO0063 # 02 Y:1986 02 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,704 $2,100 Implemented
CO0063 # 03 Y:1986 03 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $21,545 $30,000 Not Implemented
CO0063 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,571 $1,200 Implemented
CO0063 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $8,280 $0 Implemented
CO0063 # 06 Y:1986 06 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,622 $6,000 Not Implemented
CO0063 # 07 Y:1986 07 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,913 $0 Implemented
CO0063 # 08 Y:1986 08 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,273 $200 Implemented
CO0063 # 09 Y:1986 09 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $479 $500 Implemented
CO0063 # 10 Y:1986 10 1986 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $339 $750 Implemented
CO0063 # 11 Y:1986 11 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $361 $527 Implemented
TN0280 # 01 Y:1986 01 1986 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $3,536 $815 Implemented
TN0280 # 02 Y:1986 02 1986 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,530 $9,916 Not Implemented
TN0280 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,837 $10,750 Implemented
TN0280 # 04 Y:1986 04 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,539 $2,750 Implemented
TN0280 # 05 Y:1986 05 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $747 $0 Not Implemented
TN0280 # 06 Y:1986 06 1986 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $335 $445 Not Implemented
TN0280 # 07 Y:1986 07 1986 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $259 $275 Implemented
TN0281 # 01 Y:1986 01 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $6,608 $4,408 Implemented
TN0281 # 02 Y:1986 02 1986 COVER OPEN TANKS $5,049 $650 Not Implemented
TN0281 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $4,465 $1,491 Not Implemented
TN0281 # 04 Y:1986 04 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,415 $7,500 Not Implemented
TN0281 # 05 Y:1986 05 1986 ADJUST VENTS TO MINIMIZE ENERGY USE $3,340 $0 Implemented
TN0281 # 06 Y:1986 06 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $529 $182 Not Implemented
TN0281 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $105 Implemented