IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0338 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,600 $500 Implemented
GT0338 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,620 $17,560 Not Implemented
GT0338 # 04 Y:1988 04 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $1,030 Not Implemented
GT0338 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $800 $1,320 Implemented
GT0338 # 06 Y:1988 06 1988 REPAIR AND ELIMINATE STEAM LEAKS $5,280 $4,075 Implemented
GT0338 # 07 Y:1988 07 1988 INSULATE BARE EQUIPMENT $10,930 $8,220 Not Implemented
AM0039 # 01 Y:1988 01 1988 OPTIMIZE PLANT POWER FACTOR $5,350 $10,500 Not Implemented
AM0039 # 02 Y:1988 02 1988 IMPROVE LUBRICATION PRACTICES $1,470 $0 Not Implemented
AM0039 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $2,300 Implemented
AM0039 # 04 Y:1988 04 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $970 $600 Not Implemented
AM0039 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $260 $0 Implemented
AM0040 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,371 $0 Not Implemented
AM0040 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $953 $4,875 Not Implemented
AM0040 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $666 $0 Not Implemented
AM0040 # 04 Y:1988 04 1988 IMPROVE LUBRICATION PRACTICES $499 $0 Not Implemented
AM0040 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $143 $285 Not Implemented
WI0035 # 06 Y:1988 06 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $930 $1,400 Not Implemented
WI0035 # 05 Y:1988 05 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,192 $1,500 Not Implemented
WI0035 # 04 Y:1988 04 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,816 $5,000 Not Implemented
WI0035 # 03 Y:1988 03 1988 INSTALL SET-BACK TIMERS $2,537 $331 Not Implemented
WI0035 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $850 $0 Not Implemented
WI0035 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $3,262 $0 Not Implemented
WI0034 # 05 Y:1988 05 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,338 $20,000 Not Implemented
WI0034 # 04 Y:1988 04 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $434 $0 Implemented
WI0034 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,480 $6,401 Implemented