IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0164 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21 $20 Not Implemented
ND0169 # 01 Y:1993 01 1993 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $49,625 $65,000 Not Implemented
ND0169 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $17,985 $18,200 Implemented
ND0169 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,640 $21,590 Implemented
ND0169 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,876 $3,837 Implemented
ND0169 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $939 $160 Not Implemented
ND0169 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $430 Not Implemented
ND0169 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $235 $200 Not Implemented
ND0169 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $125 $200 Not Implemented
ME0112 # 01 Y:1993 01 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $745 $100 Implemented
ME0112 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $1,935 $3,500 Not Implemented
ME0112 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $408 $5,780 Not Implemented
ME0112 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,580 $27,400 Implemented
UF0074 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,092 $519 n/a
UF0074 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $458 $2,101 n/a
UF0074 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $307 $252 n/a
UF0074 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $350 $1,200 n/a
UF0074 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,726 $0 n/a
UF0074 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,178 $4,121 n/a
UF0074 # 07 Y:1993 07 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $233 $1,000 n/a
UF0074 # 08 Y:1993 08 1993 MINIMIZE WATER USAGE $8,115 $3,050 n/a
UF0074 # 09 Y:1993 09 1993 COMBINE UTILITY METERS $226 $475 n/a
KU0410 # 01 Y:1993 01 1993 UPGRADE OBSOLETE EQUIPMENT $11,139 $4,300 Not Implemented
KU0410 # 02 Y:1993 02 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,103 $8,550 Not Implemented
KU0410 # 03 Y:1993 03 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,797 $7,300 Not Implemented