IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0234 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,927 $500 Implemented
NC0234 # 04 Y:2002 04 2002 DEVELOP A REPAIR/REPLACE POLICY $199 $289 Implemented
SF0241 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,590 $0 Implemented
SF0241 # 02 Y:2002 02 2002 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,388 $380 Not Implemented
SF0241 # 03 Y:2002 03 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,551 $1,000 Not Implemented
SF0241 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,747 $777 Not Implemented
SF0241 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $238 $120 Not Implemented
SF0241 # 06 Y:2002 06 2002 UPGRADE CONTROLS ON COMPRESSORS $1,694 $1,002 Not Implemented
SF0241 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,515 $11,595 Not Implemented
SF0241 # 08 Y:2002 08 2002 REDUCE FLUID FLOW RATES $19,758 $50,798 Not Implemented
SF0241 # 09 Y:2002 09 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $10,700 $8,117 Not Implemented
SF0241 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $20,567 $16,445 Not Implemented
UD0653 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,356,000 $500,000 Implemented
UD0653 # 02 Y:2002 02 2002 DEVELOP STANDARD OPERATING PROCEDURES $222,000 $0 Implemented
UD0653 # 03 Y:2002 03 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $32,655 $36,000 Not Implemented
UD0653 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $6,181 $733 Implemented
UD0653 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,155 $2,000 Not Implemented
UD0653 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,378 $5,112 Implemented
UD0653 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $1,512 $1,125 Not Implemented
UD0653 # 08 Y:2002 08 2002 REDUCE FLUID FLOW RATES $1,381 $0 Implemented
UD0653 # 09 Y:2002 09 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $249 $42 Not Implemented
CO0510 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,580 $600 Implemented
CO0510 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $3,600 $1,560 Implemented
CO0510 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $320 $480 Implemented
CO0510 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,210 $300 Not Implemented