IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0465 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $8,200 $5,000 Not Implemented
OR0465 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $35,600 $55,000 Implemented
OR0465 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,200 $13,400 Implemented
OR0465 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,195 $2,800 Implemented
SF0292 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,014 $0 Implemented
SF0292 # 02 Y:2004 02 2004 INSTALL OCCUPANCY SENSORS $7,440 $2,833 Implemented
SF0292 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,366 $860 Implemented
SF0292 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $768 $763 Implemented
SF0292 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,755 $2,283 Implemented
SF0292 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $423 $1,125 Not Implemented
SF0292 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,181 $48,511 Implemented
SF0292 # 08 Y:2004 08 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $7,275 $12,330 Implemented
MI0094 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,368 $2,300 Implemented
MI0094 # 02 Y:2004 02 2004 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $95,473 $150 Implemented
MI0094 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-177 $590 Implemented
MI0094 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $9,418 $92 Implemented
MI0094 # 05 Y:2004 05 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,547 $0 Not Implemented
MI0094 # 06 Y:2004 06 2004 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,385 $0 Not Implemented
MI0094 # 07 Y:2004 07 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,093 $2,056 Implemented
MI0094 # 08 Y:2004 08 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $69,699 $5,966 Implemented
MI0094 # 09 Y:2004 09 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $47,623 $4,110 Implemented
OR0464 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,350 $1,350 Implemented
OR0464 # 02 Y:2004 02 2004 UPGRADE CONTROLS ON COMPRESSORS $5,200 $0 Implemented
OR0464 # 03 Y:2004 03 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $35,405 $42,000 Not Implemented
OR0464 # 04 Y:2004 04 2004 INSTALL BACK-UP EQUIPMENT $44,800 $170 Implemented