IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94,135

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0726 # 13 Y:2005 13 2005 UPGRADE CONTROLS ON COMPRESSORS $3,679 $0 Implemented
UD0726 # 14 Y:2005 14 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,948 $500 Not Implemented
UD0726 # 15 Y:2005 15 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,554 $0 Implemented
UD0726 # 16 Y:2005 16 2005 UPGRADE CONTROLS ON COMPRESSORS $1,253 $0 Implemented
UD0726 # 17 Y:2005 17 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $412 $960 Implemented
UM0289 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $164,291 $74,114 Implemented
UM0289 # 02 Y:2005 02 2005 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $56,272 $85,815 Not Implemented
UM0289 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $37,184 $11,610 Implemented
UM0289 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,576 $2,500 Implemented
UM0289 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $9,600 $1,400 Implemented
UM0289 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $859 $2,663 Not Implemented
UM0288 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,386 $10,000 Implemented
UM0288 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,865 $150 Implemented
UM0288 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,004 $400 Implemented
UM0288 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $895 $1,000 Not Implemented
UM0288 # 05 Y:2005 05 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $656 $0 Implemented
UM0288 # 06 Y:2005 06 2005 REDUCE VENTILATION AIR $616 $150 Implemented
UM0288 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $159 $25 Implemented
UM0288 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $141 $300 Not Implemented
UM0288 # 09 Y:2005 09 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $130 $50 Not Implemented
UM0288 # 10 Y:2005 10 2005 INSTALL OCCUPANCY SENSORS $90 $600 Implemented
LE0219 # 01 Y:2005 01 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,717 $1,500 Not Implemented
LE0219 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $100 Implemented
LE0219 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $80 Implemented
LE0219 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $129 $100 Implemented