IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0330 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $442 $2 Implemented
BD0330 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $621 $0 Not Implemented
BD0330 # 10 Y:2007 10 2007 USE RADIANT HEATER FOR SPOT HEATING $81,923 $0 Not Implemented
BD0330 # 11 Y:2007 11 2007 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $307,692 $5,801 Implemented
LE0259 # 01 Y:2007 01 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,497 $7,000 Not Implemented
LE0259 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,235 $500 Implemented
LE0259 # 03 Y:2007 03 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,283 $45,000 Implemented
LE0259 # 04 Y:2007 04 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,735 $37,000 Implemented
LE0259 # 05 Y:2007 05 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,811 $200 Implemented
LE0259 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,501 $50 Not Implemented
LE0259 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,938 $4,386 Not Implemented
UW0002 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,263 $85,000 Not Implemented
UW0002 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $10,893 $16,323 Not Implemented
UW0002 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,000 $9,385 Implemented
UW0002 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $5,998 $2,692 Implemented
UW0002 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $252 Implemented
UW0002 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $906 $653 Not Implemented
UW0002 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $153 $200 Implemented
MA0621 # 01 Y:2007 01 2007 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $61,876 $354,790 Not Implemented
MA0621 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,424 $29,000 Not Implemented
MA0621 # 03 Y:2007 03 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,253 $10,000 Implemented
MA0621 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $646 $2,000 Not Implemented
MA0621 # 05 Y:2007 05 2007 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $405 $280 Implemented
CO0605 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $10,260 $29,000 Not Implemented
CO0605 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,860 $81,340 Not Implemented