Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0330 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $442 | $2 | Implemented |
BD0330 # 09 Y:2007 | 09 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $621 | $0 | Not Implemented |
BD0330 # 10 Y:2007 | 10 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $81,923 | $0 | Not Implemented |
BD0330 # 11 Y:2007 | 11 | 2007 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $307,692 | $5,801 | Implemented |
LE0259 # 01 Y:2007 | 01 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,497 | $7,000 | Not Implemented |
LE0259 # 02 Y:2007 | 02 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,235 | $500 | Implemented |
LE0259 # 03 Y:2007 | 03 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,283 | $45,000 | Implemented |
LE0259 # 04 Y:2007 | 04 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,735 | $37,000 | Implemented |
LE0259 # 05 Y:2007 | 05 | 2007 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,811 | $200 | Implemented |
LE0259 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,501 | $50 | Not Implemented |
LE0259 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,938 | $4,386 | Not Implemented |
UW0002 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,263 | $85,000 | Not Implemented |
UW0002 # 02 Y:2007 | 02 | 2007 | OPTIMIZE PLANT POWER FACTOR | $10,893 | $16,323 | Not Implemented |
UW0002 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,000 | $9,385 | Implemented |
UW0002 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $5,998 | $2,692 | Implemented |
UW0002 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $700 | $252 | Implemented |
UW0002 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $906 | $653 | Not Implemented |
UW0002 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $153 | $200 | Implemented |
MA0621 # 01 Y:2007 | 01 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $61,876 | $354,790 | Not Implemented |
MA0621 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,424 | $29,000 | Not Implemented |
MA0621 # 03 Y:2007 | 03 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,253 | $10,000 | Implemented |
MA0621 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $646 | $2,000 | Not Implemented |
MA0621 # 05 Y:2007 | 05 | 2007 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $405 | $280 | Implemented |
CO0605 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,260 | $29,000 | Not Implemented |
CO0605 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,860 | $81,340 | Not Implemented |