IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0441 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,444 $702 Implemented
IA0441 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,935 $825 Not Implemented
IA0441 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,456 $650 Not Implemented
IA0441 # 06 Y:2009 06 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,420 $1,820 Not Implemented
IA0441 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $853 $479 Implemented
IA0441 # 08 Y:2009 08 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $2,129 $760 Implemented
IA0441 # 09 Y:2009 09 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $49,777 $70,000 Not Implemented
IA0441 # 10 Y:2009 10 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,097 $27,000 Implemented
IA0441 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,289 $16,600 Implemented
UW0030 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $134,729 $705,718 Not Implemented
UW0030 # 02 Y:2009 02 2009 KEEP BOILER TUBES CLEAN $115,460 $50,000 Not Implemented
UW0030 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $74,218 $166,366 Not Implemented
LL0314 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $149,374 $64,560 Implemented
LL0314 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $74,110 $7,510 Implemented
LL0314 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $59,298 $5,092 Not Implemented
LL0314 # 04 Y:2009 04 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,010 $1,350 Implemented
LL0314 # 05 Y:2009 05 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,851 $840 Not Implemented
LL0314 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $770 Implemented
LL0314 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $520 $775 Not Implemented
LL0314 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $291 $180 Not Implemented
LL0314 # 09 Y:2009 09 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $381 $120 Not Implemented
IC0157 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $363 Implemented
IC0157 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $4,848 Implemented
IC0157 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $9,923 Implemented
IC0157 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $769 $470 Not Implemented