IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0376 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,815 $9,337 Implemented
MS0376 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,513 $1,725 Not Implemented
MS0376 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,005 $953 Not Implemented
MS0376 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $1,057 $471 Not Implemented
DL0072 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $282,000 $500,000 Not Implemented
DL0072 # 02 Y:2011 02 2011 OPERATE BOILERS ON HIGH FIRE SETTING $136,800 $100,000 Not Implemented
DL0072 # 03 Y:2011 03 2011 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $19,600 $5,000 Not Implemented
DL0072 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $44,400 $2,000 Not Implemented
DL0072 # 05 Y:2011 05 2011 REDESIGN PROCESS $50,600 $5,000 Not Implemented
DL0072 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,200 $34,175 Not Implemented
DL0072 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,600 $12,840 Not Implemented
DL0072 # 08 Y:2011 08 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,150 $13,000 Implemented
DL0072 # 09 Y:2011 09 2011 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $24,840 $2,500 Implemented
DL0072 # 10 Y:2011 10 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,520 $65,000 Not Implemented
DL0072 # 11 Y:2011 11 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $26,800 $5,500 Not Implemented
DL0072 # 12 Y:2011 12 2011 REDUCE VENTILATION AIR $44,740 $4,400 Implemented
DL0072 # 13 Y:2011 13 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,200 $6,125 Implemented
DL0072 # 14 Y:2011 14 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,009 $1,045 Not Implemented
IA0465 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,456 $246 Not Implemented
IA0465 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,745 $396 Not Implemented
IA0465 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,614 $7,406 Not Implemented
IA0465 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,910 $60,314 Not Implemented
IA0465 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $1,368 $616 Not Implemented
IA0465 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $302 $13 Not Implemented
IA0465 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,240 $8,646 Not Implemented