IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144,270

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0323 # 03 Y:1995 03 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,090 $42,500 Not Implemented
CO0323 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,370 $8,790 Implemented
CO0323 # 05 Y:1995 05 1995 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,950 $34,080 Not Implemented
CO0323 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,520 $4,210 Implemented
CO0323 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,000 $7,800 Not Implemented
DS0017 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,912 $2,341 Implemented
DS0017 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,821 $5,125 Implemented
DS0017 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $501 $60 Implemented
DS0017 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $445 $560 Implemented
DS0017 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $1,065 $442 Implemented
DS0017 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $225 $121 Implemented
DS0017 # 07 Y:1995 07 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $185 $250 Implemented
TN0544 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,501 $0 Implemented
TN0544 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,786 $2,600 Implemented
TN0544 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,169 $5,480 Implemented
TN0544 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,079 $314 Implemented
TN0544 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,905 $300 Implemented
TN0559 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $9,785 $5,640 Not Implemented
TN0559 # 02 Y:1995 02 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,680 $12,800 Not Implemented
TN0559 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,531 $3,600 Not Implemented
TN0559 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,207 $990 Implemented
TN0559 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,212 $6,100 Not Implemented
TN0559 # 06 Y:1995 06 1995 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $238,000 $2,250 Implemented
TN0559 # 07 Y:1995 07 1995 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $119,243 $20,200 Not Implemented
TN0559 # 08 Y:1995 08 1995 USE EVAPORATION TO CONCENTRATE MATERIAL $61,296 $75,000 Not Implemented