Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
144,261
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0225 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,670 | $15,000 | Implemented |
AM0225 # 03 Y:1994 | 03 | 1994 | OPTIMIZE PLANT POWER FACTOR | $10,500 | $13,000 | Not Implemented |
AM0225 # 04 Y:1994 | 04 | 1994 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,260 | $0 | Implemented |
AM0225 # 05 Y:1994 | 05 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $730 | $200 | Implemented |
AM0225 # 06 Y:1994 | 06 | 1994 | USE A RAG RECYCLE SERVICE | $1,440 | $7,900 | Implemented |
AM0225 # 07 Y:1994 | 07 | 1994 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $290 | $0 | Implemented |
AM0225 # 08 Y:1994 | 08 | 1994 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $0 | $7,500 | Not Implemented |
AM0225 # 09 Y:1994 | 09 | 1994 | MODIFY MATERIAL APPLICATION METHODS | $0 | $7,500 | Implemented |
WI0221 # 01 Y:1994 | 01 | 1994 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,665 | $12,000 | Not Implemented |
WI0221 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,991 | $8,236 | Not Implemented |
WI0221 # 03 Y:1994 | 03 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,803 | $0 | Implemented |
WI0221 # 04 Y:1994 | 04 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $838 | $1,000 | Implemented |
WI0221 # 05 Y:1994 | 05 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $186 | $640 | Implemented |
WI0221 # 06 Y:1994 | 06 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $182 | $0 | Not Implemented |
WI0221 # 07 Y:1994 | 07 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $138 | $500 | Implemented |
OR0223 # 01 Y:1994 | 01 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,968 | $5,768 | Implemented |
OR0223 # 02 Y:1994 | 02 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,407 | $4,000 | Implemented |
OR0223 # 03 Y:1994 | 03 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $558 | $1,345 | Implemented |
OR0223 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,364 | $4,800 | Not Implemented |
OR0223 # 05 Y:1994 | 05 | 1994 | OPTIMIZE PLANT POWER FACTOR | $695 | $2,000 | Implemented |
OR0223 # 06 Y:1994 | 06 | 1994 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $23,850 | $106,600 | Implemented |
OR0223 # 07 Y:1994 | 07 | 1994 | REDUCE SCRAP PRODUCTION | $14,250 | $6,500 | Implemented |
ND0201 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,607 | $10,935 | Implemented |
ND0201 # 02 Y:1994 | 02 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,307 | $420 | Implemented |
ND0201 # 03 Y:1994 | 03 | 1994 | INSTALL OCCUPANCY SENSORS | $2,915 | $600 | Not Implemented |