Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,443
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0283 # 05 Y:1989 | 05 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $291 | $350 | Implemented |
KU0283 # 06 Y:1989 | 06 | 1989 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,986 | $4,440 | Not Implemented |
KU0283 # 07 Y:1989 | 07 | 1989 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $318 | $0 | Not Implemented |
KU0283 # 08 Y:1989 | 08 | 1989 | REDESIGN PROCESS | $11,461 | $13,200 | Not Implemented |
KU0283 # 09 Y:1989 | 09 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $241 | $0 | Implemented |
KU0283 # 10 Y:1989 | 10 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,395 | $2,300 | Not Implemented |
KU0284 # 01 Y:1989 | 01 | 1989 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $831,745 | $1,230,000 | Implemented |
KU0284 # 02 Y:1989 | 02 | 1989 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $139,391 | $226,000 | Implemented |
KU0284 # 03 Y:1989 | 03 | 1989 | INSTALL SET-BACK TIMERS | $16,143 | $5,856 | Implemented |
KU0284 # 04 Y:1989 | 04 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,092 | $3,080 | Implemented |
KU0284 # 05 Y:1989 | 05 | 1989 | IMPROVE LUBRICATION PRACTICES | $2,169 | $0 | Implemented |
KU0284 # 06 Y:1989 | 06 | 1989 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $618 | $0 | Implemented |
KU0284 # 07 Y:1989 | 07 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $931 | $1,018 | Implemented |
KU0284 # 08 Y:1989 | 08 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $169 | $0 | Implemented |
KU0263 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,737 | $5,000 | Implemented |
KU0263 # 02 Y:1988 | 02 | 1988 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,188 | $4,000 | Not Implemented |
KU0263 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,211 | $1,600 | Implemented |
KU0263 # 04 Y:1988 | 04 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,486 | $1,308 | Implemented |
KU0263 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $219 | $0 | Implemented |
KU0263 # 06 Y:1988 | 06 | 1988 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $187 | $0 | Implemented |
KU0263 # 07 Y:1988 | 07 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $269 | $0 | Implemented |
KU0263 # 08 Y:1988 | 08 | 1988 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $108 | $0 | Not Implemented |
KU0263 # 09 Y:1988 | 09 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $610 | $920 | Not Implemented |
KU0265 # 01 Y:1988 | 01 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,309 | $2,400 | Not Implemented |
KU0265 # 02 Y:1988 | 02 | 1988 | INSTALL SET-BACK TIMERS | $1,548 | $400 | Not Implemented |