IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0811 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $160 $944 Implemented
OK0811 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $32,372 $270,346 Not Implemented
OK0811 # 08 Y:2011 08 2011 MINIMIZE WATER USAGE $159,930 $46,397 Not Implemented
OK0811 # 09 Y:2011 09 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $61,620 $459 Not Implemented
OK0811 # 10 Y:2011 10 2011 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $22,682 $0 Implemented
OK0807 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $300,355 $463,765 Not Implemented
OK0807 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,088 $3,375 Implemented
OK0807 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,179 $29,929 Not Implemented
OK0807 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,927 $94,677 Not Implemented
OK0807 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $18,895 $0 Implemented
OK0807 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,936 $4,200 Implemented
OK0807 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,980 $3,757 Not Implemented
OK0807 # 08 Y:2011 08 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,163 $12,100 Not Implemented
OK0807 # 09 Y:2011 09 2011 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $7,260 $14,928 Not Implemented
OK0806 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $109,231 $57,500 Not Implemented
OK0806 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,484 $37,707 Implemented
OK0806 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,177 $38,005 Implemented
OK0806 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $7,724 Implemented
OK0806 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,172 $1,600 Implemented
OK0806 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,602 $414 Implemented
OK0806 # 07 Y:2011 07 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,222 $870 Not Implemented
OK0806 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $6,859 $2,964 Not Implemented
OK0806 # 09 Y:2011 09 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,676 $7,130 Not Implemented
OK0804 # 01 Y:2011 01 2011 Install Anaerobic Digester $544,130 $5,652,880 Not Implemented
OK0804 # 02 Y:2011 02 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,961 $238,050 Not Implemented