IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0265 # 15 Y:2014 15 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,303 $1,260 Not Implemented
MI0265 # 16 Y:2014 16 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,306 $10,640 Implemented
MI0265 # 17 Y:2014 17 2014 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,975 $140 Not Implemented
MI0265 # 18 Y:2014 18 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,758 $80 Implemented
MI0265 # 19 Y:2014 19 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,375 $347 Implemented
MI0265 # 20 Y:2014 20 2014 INSULATE BARE EQUIPMENT $82 $92 Not Implemented
UD0909 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,106 $510 Not Implemented
UD0909 # 02 Y:2014 02 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,680 $1,125 Implemented
UD0909 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $16,710 $4,000 Not Implemented
UD0909 # 04 Y:2014 04 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $759 $500 Not Implemented
UD0909 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $2,940 Implemented
UD0909 # 06 Y:2014 06 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,214 $5,000 Implemented
UD0909 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $1,000 Implemented
UD0909 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,327 $3,000 Not Implemented
UD0909 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $0 Implemented
UD0909 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $0 Implemented
UD0909 # 11 Y:2014 11 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $7,664 $8,319 Not Implemented
UD0909 # 12 Y:2014 12 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,987 $17,000 Not Implemented
TT0139 # 01 Y:2014 01 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $117 $126 Not Implemented
TT0139 # 02 Y:2014 02 2014 DISCONNECT BALLASTS $280 $100 Implemented
TT0139 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,460 $500 Implemented
TT0139 # 04 Y:2014 04 2014 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $76,287 $2,900 Not Implemented
LE0385 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,165 $40 Not Implemented
LE0385 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,455 $1,000 Implemented
LE0385 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,210 $3,040 Not Implemented