IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144,009

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0438 # 10 Y:1994 10 1994 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $4,788 $11,794 Not Implemented
MO0126 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,096 $12,303 Implemented
MO0126 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,286 $615 Implemented
MO0126 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,207 $7,456 Not Implemented
MO0126 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $623 $155 Not Implemented
MO0126 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $600 $295 Not Implemented
MO0126 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,600 $4,200 Not Implemented
MO0126 # 07 Y:1994 07 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $51 $75 Not Implemented
MS0005 # 01 Y:1994 01 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,137 $2,700 Not Implemented
MS0005 # 02 Y:1994 02 1994 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $1,737 $8,100 Not Implemented
MS0005 # 03 Y:1994 03 1994 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $628 $500 Not Implemented
MS0005 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,714 $1,321 Not Implemented
MS0005 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,794 $1,000 Not Implemented
TN0516 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $81,008 $114,200 Implemented
TN0516 # 02 Y:1994 02 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,983 $1,750 Implemented
TN0516 # 03 Y:1994 03 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,822 $26,900 Implemented
TN0516 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $14,244 $2,200 Implemented
TN0516 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $2,022 $3,735 Implemented
TN0516 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,597 $460 Implemented
TN0516 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $952 $796 Implemented
TN0516 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $601 $430 Implemented
TN0516 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $161 $345 Not Implemented
UD0437 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,799 $0 Not Implemented
UD0437 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,097 $1,500 Not Implemented
UD0437 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,349 $500 Not Implemented