IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0148 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,792 $850 Not Implemented
AR0148 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $40,673 $1,200 Implemented
AR0148 # 06 Y:1998 06 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $39,295 $91,825 Implemented
AR0148 # 07 Y:1998 07 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,600 $6,000 Not Implemented
AR0148 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,787 $1,000 Implemented
AR0148 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,143 $0 Not Implemented
AR0144 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $9,562 $14,895 Not Implemented
AR0144 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,907 $1,060 Not Implemented
AR0144 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $530 $333 Implemented
AR0144 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,876 $0 Not Implemented
AR0144 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,575 $160 Implemented
AR0144 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $7,588 $10,500 Not Implemented
AR0144 # 07 Y:1998 07 1998 METER WASTE WATER $6,423 $500 Not Implemented
AR0144 # 08 Y:1998 08 1998 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $23,958 $0 Not Implemented
AR0144 # 09 Y:1998 09 1998 AUTOMATE PAYROLL SYSTEM $217,800 $85,000 Not Implemented
AR0143 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,674 $300 Not Implemented
AR0143 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $269 $460 Implemented
AR0143 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $619 $0 Implemented
AR0143 # 04 Y:1998 04 1998 INSTALL SET-BACK TIMERS $1,859 $2,080 Implemented
AR0143 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,363 $150 Implemented
AR0143 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $383 $120 Not Implemented
AR0143 # 07 Y:1998 07 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,960 $10,000 Implemented
AR0143 # 08 Y:1998 08 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,233 $2,000 Implemented
AR0143 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $19,710 $2,250 Implemented
AR0143 # 10 Y:1998 10 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $584 $337 Not Implemented