Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,738
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0148 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,792 | $850 | Not Implemented |
AR0148 # 05 Y:1998 | 05 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $40,673 | $1,200 | Implemented |
AR0148 # 06 Y:1998 | 06 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $39,295 | $91,825 | Implemented |
AR0148 # 07 Y:1998 | 07 | 1998 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,600 | $6,000 | Not Implemented |
AR0148 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,787 | $1,000 | Implemented |
AR0148 # 09 Y:1998 | 09 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,143 | $0 | Not Implemented |
AR0144 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $9,562 | $14,895 | Not Implemented |
AR0144 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,907 | $1,060 | Not Implemented |
AR0144 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $530 | $333 | Implemented |
AR0144 # 04 Y:1998 | 04 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,876 | $0 | Not Implemented |
AR0144 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,575 | $160 | Implemented |
AR0144 # 06 Y:1998 | 06 | 1998 | INSULATE BARE EQUIPMENT | $7,588 | $10,500 | Not Implemented |
AR0144 # 07 Y:1998 | 07 | 1998 | METER WASTE WATER | $6,423 | $500 | Not Implemented |
AR0144 # 08 Y:1998 | 08 | 1998 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $23,958 | $0 | Not Implemented |
AR0144 # 09 Y:1998 | 09 | 1998 | AUTOMATE PAYROLL SYSTEM | $217,800 | $85,000 | Not Implemented |
AR0143 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,674 | $300 | Not Implemented |
AR0143 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $269 | $460 | Implemented |
AR0143 # 03 Y:1998 | 03 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $619 | $0 | Implemented |
AR0143 # 04 Y:1998 | 04 | 1998 | INSTALL SET-BACK TIMERS | $1,859 | $2,080 | Implemented |
AR0143 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,363 | $150 | Implemented |
AR0143 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $383 | $120 | Not Implemented |
AR0143 # 07 Y:1998 | 07 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $6,960 | $10,000 | Implemented |
AR0143 # 08 Y:1998 | 08 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $12,233 | $2,000 | Implemented |
AR0143 # 09 Y:1998 | 09 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,710 | $2,250 | Implemented |
AR0143 # 10 Y:1998 | 10 | 1998 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $584 | $337 | Not Implemented |