IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0168 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,517 $2,790 Implemented
BD0168 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $339 $318 Implemented
BD0168 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $258 $400 Implemented
BD0168 # 08 Y:2000 08 2000 USE SYNTHETIC LUBRICANT $216 $500 Implemented
BD0168 # 09 Y:2000 09 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $8,439 $32,000 Implemented
BD0168 # 10 Y:2000 10 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,751 $3,000 Implemented
BD0168 # 11 Y:2000 11 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,048 $100 Implemented
BD0168 # 12 Y:2000 12 2000 MINIMIZE WATER USAGE $490 $1,000 Implemented
BD0168 # 13 Y:2000 13 2000 SELL USED PLATES TO AN ALUMINUM RECYCLER $224 $400 Implemented
BD0168 # 14 Y:2000 14 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $2,823 $6,000 Implemented
BD0168 # 15 Y:2000 15 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,013 $0 Implemented
UM0169 # 01 Y:2000 01 2000 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $15,444 $2,250 Implemented
UM0169 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,322 $800 Implemented
UM0169 # 03 Y:2000 03 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $27,956 $8,250 Not Implemented
UM0169 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $13,069 $23,100 Not Implemented
UM0169 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,117 $500 Implemented
UM0169 # 06 Y:2000 06 2000 USE RADIANT HEATER FOR SPOT HEATING $8,102 $10,000 Implemented
UM0169 # 07 Y:2000 07 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,084 $350 Not Implemented
UM0169 # 08 Y:2000 08 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $50,433 $23,500 Implemented
UM0169 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $312,500 $860,000 Not Implemented
NV0164 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $95,346 $200 n/a
NV0164 # 02 Y:2000 02 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $75,664 $100 n/a
NV0164 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,258 $0 n/a
NV0164 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,704 $150 n/a
NV0164 # 05 Y:2000 05 2000 MODIFY WORKLOAD $8,134 $0 n/a