IAC logo
IAC Assessment: BD0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Loader Attachments
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 33,000
Annual Production 8,750 Units
Production Hrs. Annual 4,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,959 1,000,293 kWh $0.04
Electricity Demand $36,326 3,016 kW-months/year $12.04
Electricity Fees $292 - $ -
Natural Gas $64,078 20,254 MMBtu $3.16
TOTAL ENERGY COSTS $147,158
RECOMMENDED SAVINGS* $33,026 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,026
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Solid Waste (haz) One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Solid Waste (haz) One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$7,663
Cost:
$11,200
- - - 39 $7,663 2,408 - - - - - - - - - - -
-
kWh
-
39
kW-months/year
$7,663
2,408
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,966
Cost:
$2,169
$1,966 195,780 - - - - - - - - - - - - - - $1,966
195,780
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,647
Cost:
$1,700
$909 20,809 $738 61 - - - - - - - - - - - - $909
20,809
kWh
$738
61
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,632
Cost:
$1,650
$716 16,413 $916 76 - - - - - - - - - - - - $716
16,413
kWh
$916
76
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,517
Cost:
$2,790
$937 21,395 $580 48 - - - - - - - - - - - - $937
21,395
kWh
$580
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$339
Cost:
$318
$146 3,224 $55 5 - - - - - - - - $138 - - - $146
3,224
kWh
$55
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$138
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$258
Cost:
$400
$142 3,224 $116 10 - - - - - - - - - - - - $142
3,224
kWh
$116
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$216
Cost:
$500
$120 2,638 $96 8 - - - - - - - - - - - - $120
2,638
kWh
$96
8
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$8,439
Cost:
$32,000
- - - - - - $8,439 6,480 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,439
6,480
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
10: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$3,751
Cost:
$3,000
- - - - - - - - $3,751 297 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,751
297
gal
-
-
lb
-
-
$
-
-
$
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,048
Cost:
$100
- - - - - - - - - - $1,048 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$1,048
-
lb
-
-
$
-
-
$
12: 3.4151 MINIMIZE WATER USAGE Savings:
$490
Cost:
$1,000
- - - - - - $490 140,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$490
140,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
13: 3.5241 SELL USED PLATES TO AN ALUMINUM RECYCLER Savings:
$224
Cost:
$400
- - - - - - - - - - - - - - $224 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$224
-
$
14: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$2,823
Cost:
$6,000
- - - - - - - - - - - - - - $2,823 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$2,823
-
$
15: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,013
Cost:
-
- - - - - - - - - - - - - - $1,013 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$1,013
-
$
TOTAL RECOMMENDED Savings:
$33,026
Cost:
$63,227
$4,936 263,483 $2,501 247 $7,663 2,408 $8,929 146,480 $3,751 297 $1,048 - $138 - $4,060 - $4,936
263,483
kWh
$2,501
247
kW-months/year
$7,663
2,408
MMBtu
$8,929
146,480
Tgal
$3,751
297
gal
$1,048
-
lb
$138
-
$
$4,060
-
$
TOTAL IMPLEMENTED Savings:
$33,026
Cost:
$63,227
$4,936 263,483 $2,501 247 $7,663 2,408 $8,929 146,480 $3,751 297 $1,048 - $138 - $4,060 - $4,936
263,483
kWh
$2,501
247
kW-months/year
$7,663
2,408
MMBtu
$8,929
146,480
Tgal
$3,751
297
gal
$1,048
-
lb
$138
-
$
$4,060
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Solid Waste (haz) One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Solid Waste (haz) One-time Revenue or Avoided Cost Primary Product