IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0137 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,436 $1,074 Implemented
MI0137 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,902 $30 Implemented
MI0137 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,327 $48 Implemented
MI0137 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,128 $175 Implemented
MI0137 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $901 $3,400 Implemented
MI0137 # 07 Y:2006 07 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $661 $2,809 Implemented
IA0392 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,713 $40,358 Implemented
IA0392 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,511 $66,554 Implemented
IA0392 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,749 $7,994 Implemented
IA0392 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $1,893 $3,850 Not Implemented
IA0392 # 05 Y:2006 05 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,308 $735 Implemented
IA0392 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,268 $2,268 Implemented
IA0392 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,514 $1,650 Implemented
IA0392 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $657 $1,300 Not Implemented
IA0391 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $410 Implemented
IA0391 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $198 Not Implemented
IA0391 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $136 $89 Implemented
IA0391 # 04 Y:2006 04 2006 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $3,433 $1,735 Implemented
IA0391 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,668 $12,865 Not Implemented
IA0391 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $5,577 $349 Not Implemented
IA0391 # 07 Y:2006 07 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $804 $600 Implemented
UF0385 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,322 $7,864 Not Implemented
UF0385 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $0 Not Implemented
UF0385 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,469 $686 Not Implemented
UF0385 # 04 Y:2006 04 2006 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,145 $24 Not Implemented