IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0375 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,407 $144,900 Implemented
MS0375 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,185 $26,542 Implemented
OR0570 # 01 Y:2011 01 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,863 $1,120 Implemented
OR0570 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $6,640 $2,250 Not Implemented
OR0570 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $21,600 $12,010 Not Implemented
OR0570 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,900 $17,900 Not Implemented
OR0570 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $983 $1,000 Not Implemented
OR0570 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $695 $750 Not Implemented
OR0570 # 07 Y:2011 07 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $157,400 $191,000 Not Implemented
OR0570 # 08 Y:2011 08 2011 MAKE A NEW BY-PRODUCT $91,432 $156,000 Not Implemented
OR0570 # 09 Y:2011 09 2011 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $543,000 $1,200,000 Not Implemented
OR0570 # 10 Y:2011 10 2011 INSTALL SKYLIGHTS $2,930 $9,050 Not Implemented
OR0570 # 11 Y:2011 11 2011 OPTIMIZE PLANT POWER FACTOR $10,100 $51,900 Not Implemented
LE0320 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,024 $2,093 Not Implemented
LE0320 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,159 $1,360 Implemented
LE0320 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,200 $5,076 Not Implemented
LE0320 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $356 $180 Implemented
LE0320 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $9,057 $19,312 Implemented
LE0320 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $6,336 $12,169 Not Implemented
WV0431 # 01 Y:2011 01 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $135,254 $682,000 Implemented
WV0431 # 02 Y:2011 02 2011 USE OPTIMUM THICKNESS INSULATION $29,707 $75,000 Not Implemented
WV0431 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,355 $11,500 Not Implemented
WV0431 # 04 Y:2011 04 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,105 $1,850 Implemented
WV0431 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $6,207 $1,076 Implemented
WV0431 # 06 Y:2011 06 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,020 $0 Not Implemented